Outline Specifications for GRP Roof & Gutter Lining Installation.

 

ROOF-LINE Specification GRP Flat Roofing
GUTTER-LINE
GUTTER-LINE Specification GRP Gutter Lining

To a prepared roof deck:

Supply and install 19mm treated timber battens fixed to the roof perimeter, fixed 10mm below the roof deck to allow roof expansion and vapour egress.

Appropriate Insulation can be incorporated into the roof construction at this stage if required.

Supply, cut to shape and install one layer of 2mm nom FLEX-BASE Specially Prepared Preformed GRP Sheet, forming all upstands, downturns and incorporating all necessary flashing detail, lapping all sheets by at least 30mm to form the base layer.

Supply and install water-check and or drip detail preformed GRP roof edge trims, secured to the previously fixed 19mm treated timber battens. Face fix trims every 300mm with appropriate colour coded fixings.

Laminate together all preformed base layer and detail using 100mm wide 450gsm Chopped Strand Glassfibre Mat consolidated in Pre-accelerated Polyester Laminating Resin creating an intrinsically waterproof single layer structure.

At one square metre intervals create Secret Mobile Negative Wind Lift fixings and laminate in, using part preformed materials ensuring freedom of joint movement, and laminate in. Only appropriate non-corrosive fixings suitable for the roof deck/joists to be used.

Wet lay not less than one further layer of 450gsm Chopped Strand Glassfibre Mat consolidated in Pre-accelerated Polyester Laminating Resin to the entire roof area with ratios of Resin to Mat all as per manufacturer's recommendations and allow to cure.

To the newly created construction apply by brush a liberal covering of Pre-accelerated UV stable Polyester Flowcoat (Gelcoat), Colour to be specified, into which (if required) broadcast a layer of 6mm clean limestone chippings (or similar) prior to cure to ensure a good bond.

NB: A range of other finishes may also be considered which may be applied during or after the Flocoat is cured. Imitation lead roofs can be constructed incorporating roll mops and flashings.
The above specification can be altered to suit the desired strength/appearance, but the basic principles of an independent roof covering able to tolerate thermal and structural movement must be adhered to.

To a prepared gutter:

Ease cover flashings, closure panels or roof coverings to allow for the installation of the pre-formed upstand lining.

Crop any bolts protruding into the existing gutter level with the nut to minimise undulation within the new gutter lining.

Insulation can be incorporated into the gutter at this stage if required.

Supply, cut to shape and install one layer of 2mm nom FLEX-BASE Specially Prepared Preformed GRP Sheet, forming base, sides, outlets, expansion joints, weir ends and the like beneath the existing roof covering, lapping all sheets by at least 30mm.

The gutter volume may be increased or extra outlets incorporated at this stage if required.

Laminate together all joints and detail using 100mm wide 450gsm Chopped Strand Fibreglass Mat consolidated in Pre-accelerated Polyester Laminating Resin creating an intrinsically waterproof single layer structure.

Into the newly formed structure introduce a layer of not less than 2mm thick Synthetic Core material and a further layer of not less than 450gsm Chopped Strand Fibreglass Mat overlapping the Synthetic Core material by at least 50mm each side, all consolidated in Pre-accelerated Polyester Laminating Resin with ratios of Resin to Mat all as per manufacturer's recommendations.

Re-dress/secure cover flashings/roof coverings and the like.

To the newly created lining apply a liberal covering of Pre-accelerated UV stable Polyester Flocoat (Gelcoat) by brush, lead gray in colour unless otherwise specified.

NB: A range of other finishes may also be considered which may be applied during or after the Flocoat is cured. A non-slip finish should be considered where regular access is required.
The above specification can be altered to suit the desired strength/appearance, but the basic principles of an independent gutter lining able to tolerate thermal and structural movement must be adhered to.


Construction of GRP Roofs and Gutter Linings should only carried out in temperatures above 5 degrees and in dry weather.

 